BỘ GIÁO DỤC VÀ ĐÀO TẠO TRƯỜNG ĐẠI HỌC SƯ PHẠM KỸ THUẬT THÀNH PHÓ HÒ CHÍ MINH DO AN TOT NGHIỆP NGANH INDUSTRIAL MANAGEMENT CONTROLLING HEADCOUNT STANDARD MODEL FOR STHI MODULE AT INTEL PRODUCTS VIETNAM CO.,LTD GVHD: NGUYEN THI MAI TRAM SVTH: HO TRUNG HIEU SKLOO7148 TP. Hồ Chí Minh, tháng 8/2020 —— —.——=——-——m MINISTRY OF EDUCATION AND TRAINING HO CHI MINH CITY UNIVERSITY OF TECHNOLOGY AND EDUCATION FACULTY OF ECONOMICS ¿x£A£1$2 GRADUATION THESIS TOPIC CONTROLLING HEADCOUNT STANDARD MODEL FOR STHI MODULE AT INTEL PRODUCTS VIETNAM CO., LTD Student : Ho Trung Hieu —>>>>>}!L<<<<<<=<==<<c r2 toc co c5 mm, Ss Student ID : 16124115 Course > 2016 Major : Industrial Management Instructor :M.E Nguyen Thi Mai Tram THU VIỆN TRƯỜNG ĐIISPKT Se Ho Chi Minh City, August, 2020 SS) 6 << SSE ee SS SE SS oe Parbe SK eet COMMENTS OF INSTRUCTOR Ho Chi Minh City,. August, 2020 Instructor COMMENTS OF THE COMMITTEE MEMBERS Ho Chi Minh City, .August, 2020 Members of the committee ACKNOWLEDGEMENT First and foremost, I would like to express my special thanks of gratitude to all lectures of Faculty of Economics at Ho Chi Minh City University of Technology and Education who had conveyed the profound knowledge to all students and had provided the best condition for me to take the internship at Intel Products Vietnam Co. Besides, I wish to express my sincere thanks and gratitude to Ms.
Nguyen Thi Mai Tram, who has guided and supported me to choose the topic as well as complete this graduate thesis. I wish to express my heartfelt regards to Intel Products Vietnam Co., Ltd for offering me a great opportunity to work, research and experience in such a wonderful place to start the career here. My grateful thanks are also extended to my manager Ms. Nguyen Thi Huynh Trang and my buddy Mr.
Tran Chien Thang for guiding as well as helping me wholeheartedly during 6-month internship here. As my knowledge is restricted, this thesis cannot avoid mistakes, I hope all of you to be willing to give me your comments as well as recommendations to improve better. I wish you the best health and success in your future career. Ho Chi Minh City,.
August, 2020 Student Ho Trung Hieu ủi LIST OF ABBREVIATIONS ABBREVIATIONS EXPLANATION ATM Assembly Test Manufacturing CAP Concept of area profile CAPS Capacity Analysis and Parameter System CSM Current state map CW Contingent worker DL Direct labor ¡DO Direct observation DOE Design of experiment bh Engineering experiment ES Equipment Specialist EUPH : I:ffective units per hour FSM Future state map GU Goal utilization HC Headcount IE Industrial Engineering ILO International Labor Organization JIT Just in time ME Module Engineer MFG Manufacturing MIU Man-hour utilization MMR Man-Machine Ratio MPE Module process engineer MSE Manufacturing System Fngineering MT Manufacturing, Technician: NST Non schedule time — NVA ‘Non value-added iv NVA-R Non value-added but required OS2 Operation Specialist level 2 OT Over time PDCA Plan-Do-Check-Act PM Preventive maintenance POR Plan of Record RBS Run based setup ROI Return on investment RV Reliability verification Ise Station controller spr Scheduled downtime | TolUn Tool utilization Te Test program TPS ‘Toyota Production System USDT Unscheduled downtime VA Value-added VF Virtual factory VNAT Vietnam Assembly Test WIP Work in process/progress Www Work week LIST OF FIGURES FigufE 1-1: Tntel.CotpoTniOHÍ ÏOBOssc66c-sss6cc 6k0 0á 04Á460X6611s006430416148101560818564418540346 5 Eigitie 1. Intel: Products Vieliaatn Cos. ENG csisscssecsescasscscssssataciccncccavsaatameacisasveacassassuewsniavicts 6 FRETS TC HCV ONO IO BG: ccccscensoncxrsncrnoncoretiensnsarammneninaraoreaianeantonnmnneenemsnemnce: 7 Figure 1. Home of Intel Vietnam.
Year on Year Headcount growth at Intel Vietnam. Front and back side of SoC family produ€t. Organization chart of Intel Products Vietnam. Intel company 2019 financial stateimenIt.9, Intel company 2019 financial statement for production lines.
14 Flipure:1210: Ipill S0 nrOdUGoygissit60146300514N./00SW5SS039G060400-ã 0n nan 16 Figure 2.1; Lean Manufacturing model aisisissssissscrssssssscscwscecapieiaisasanedccesdiscsteiscsasesicesestsisance 18 Figure 2. The 7 wastes of Lean ManufaCtUFÏTI.- << << «ssc<sxe<vxeesxsesrseseszxee 20 Figure 2:3, Spaghetts Gidaram Visa lization csccvesccssssiessocvessesonvsssvsssevesssisivencivsaventcisevessases 23 Figure 2. Step to implement Kaizen event .ccccccsesesesessneeesescseseecsesssseeescnenceeaeseasacerers 26 Figure'2;5, Working time: standard .ssssseoorseneensoonsssnssneconerosessesesernsonsenessonssnssncsonenusancnegnad | Eipure 2:6: EatiBUue sStn\dAfO-iscoccqcHcdq(cáts600s10201 2044 5S4GI22G20 4306 3Q44seg EipurE 3:1. STHI-ni0d016 stữùGL(UE,usdsaa do kioncboEGGUA0053G0ã6AG0a:5/1,0ã864G6ãGGSSS6,suAx:34 Figure 3.
VEF Headcount modcÌ OVFVÏ€W. The relationship between headcount standard model and layout. Headcount distribution for cach link of SH module,,. Specs summary for SÏ[I II ttiod[UÏE,.
2 c2 5c 55S2Sx‡S+*czv££zzxcsezerx 45 Figure 3. The process map of headcount continuous improvement. Machine actual utilization (relied on Semi-E1O) .cccccssescsesescccssssscessessscseneneees 49 vi Figure 3. The current statistics about idle tool time in the period shown.
The gap between CAP standard and DO result.--s- ss5ss+secsesses+e 55 Figure 4. Spaghetti điagram of STHI module. The improvement for Kanban recognnitÏOn. The amount of time MTs take to get lot from BOL Kanban.
Proposed solution for cart đirection and Kanban space utilization. Proposed solution for order ticket pOSitiOn. The current input/output cart Kanban position. The proposed input/output cart Kanban position.- s55 s<s<scses=scxzz 65 Figure 4.
The current gap of robot arm speed between standard and reality. The current process of splitting, lot Bìn,. 5c s< se vekksexeeesese 68 Figure 4. The proposed proccss of splitting, lót lim .ss5 5555 se ssScsesscscsexee 69 Figure 4.
Regulation for Break time COVCF(IC .s-5< S56 SvStx se xeverererxcerecee 70 Figure 4. Pushing cart guidance to commit safcty and reduce MSDs. The current process of making decision for on hold lot. The proposed process of making decision for on hold lot.
The amount of time needed for MTs to make decision for on hold lot. The future statistics about performannC€. s- 5 s<5se 5s Sex cvvvy 81 Figure 4. The future statistics about idle tool time in the period shown.18; STH monthly Output report sssssissnsssciscascacctascousscerestccecaimeieeesssivaciusencieeiekes 84 vii LIST OF TABLES Table 2.
The purpose of Direct observation sississiscscsasccsissssissesceiecssvecseesonsseasscssvessacstuiatves 21 Table 2. Ashcroft theory table-the number of machines of which one operator is in charge Si691)10939023984060514EHI91846W54446015904014314018131405440010102205614831091550434435142605340180x55314034u416/380004031u586188gu8E 29 Table 3. Allowable working hours standard (available time) .--c‹s- ss<ses+2 34 Table 3. Fatigue allowance standard for each moduÌe .- -s- «5s sss>xsxeseserxxx 36 Table 3.
MMR for each product of STHĨ module.MMRstandard for STHĨ mođủlê. Headcount planning for STH module.--- << s<5s<ssss+++<+zzzzzszszse 40 Table 3,6. The number of Kanbans of STHI module. Concept of area profile for MMIÏ S,.ssssss<scxxsxesexssekekererkeserersesrrersree ad Table 3.
Concept of area profile with parameter for ÌMÍTS. Semi-E10 current data analysis for SPHI module. The current SẴemi-EI0 parameter summary for ŠTHI module. The gap in the number of product tested between plan and reality.
Concept of area profile for MTs with the current data collection. The layout symbol and its expÏanation.-‹--«<s5ses<esz<seeeseeseseeve. The comparison between current process and proposed process for getting lot %iš§¿p4311a93164z/6514853413384010483630416832827240463136ãi36116336i843ãi3i480tL0gã218i82/400360:81439G0G2AGL214áGXcG4SSLUS8. Current time and proposal time for load and unload tray activ ities.
The comparison of robot arm speed between standard and collection. Cart pusher utilization of other MOdUIES. Lean manufacturing, SyMboI. The time collected of M'l's for handling on hold lot .ccccscssssesesseseesesesseseeseeees 78 viii Table 4.
Concept of area profile for MTs after improvemenIt. MMR for each product of STHI module after ïmprovement. MMR standard for STHI module after improvement. Semi-E10 future data analysis for STHI module.
Headcount plan of record (POR) sissssisississcssscssacascsssssesssssnacaaassteasssoscsstssvesstouse 85 ix TABLE OF CONTENTS CONEMENTSOEIHNGITLRUC LỚI.:sz;xayä/ðy4061800ãGSWGHSINSMBiGGSAXAGsgìaitsugg i COMMENTS OF THE COMMITTEE MEMBERS .sccssessessssscssssssssecsssnecsesssessccasesscense ii ACKNOWLEDGE MEME. ssassusicovsxceswesasvesussurosusctasssaeasicanveas vas sanvovecuseuveasvevaswacaaseaernesaiete iii D01 0E ERE VÀ TƯ ÀNG Sssviaoteetoitraitttseltbiftost04600E940X0A01210253/80/90067040 3004400 4012 iv LIST OF PIGURES sssisisaisssissorsiesrenecsarersrneracagnesoeennoressnnerancocounvasnrenecseusseseconssvereiinncenreesvypivgs vi EAST OF TABLEIbsskioiac6i6t0ioi466tssWGEaQIS0Avã600XXSR@004gđãt2o@adess viii ABLE OF CONTENDS koeeisd202200126046560520450ã019204i4G08060iS686340386xi3asasai x ENT THÔN GunceeebieekebiadedGiogiordptaaoditoi6051494005nb63108i61140880008363180615360010015ua33uk86 1 1.:ñH0IMIIG Of the OBIE, nnorecrrorcorrsnersnonsennsnmnaaverovnvsnynsitnnsbassonioencensssesenspaontenavennessinsnestenseses 1 Z, Objectives: sarc QOÁÍ(á616000100110GG0A4481402g 1m2 sesemusyeseeasesseseseseeeeeeneessssseroeseerssrmreenend 2 3::Rsearch:obiB0E2/G050000/00N0/1080660A30/0á000A0G0X%ï@bGGIGESWSISWSXGstaqxvak 2 4::SGGDE:0EYESGBFDHE biitriccficsg10121001/01062)10606409000ã4606133516464.0ể6xã1200ãi20608085583 G610 SGQui 2 Sj RESEGRCH RETRO uuueiiceieaeioeerioiAi9100010140160126250À148833105405314900301161g408818:4801Gx66 2 Gy: SUUICITS DEANS FEPAE op ccenoreecosnornsuonneecnnsnaiunnenncanevonenaeneasaxorceesenantereaseimmanrecasoacacunncenteents 3 CHAPTER 1: INTEL PRODUCTS VIETNAM CO. Intel Products Vietnam Co. HfStOTY O1 The GðHIDADV unoctgdáhoacdtidiatsttobioasattsggx8iGxcxssssvxcxxsssse 4 11:4.
VI Bá naungabstidbniuiiipsidiilica10084ã8120110600146448k6uãeg3ac24604535a88d4x.3107061 6VOIBHDE eeesnnnaeeHeehniniiinodensaleEi81165640906076A58s0104646x5i/66k5)8016gi0210 6 1. Intel VaÌUC8.« «<1 tàn TH 2111 ng cờ 7 1. Intel Vietnam WOFkÍOFCC. ng TH HH ngu gygxee 9 1.
Business field of Intel Produets Vietnam CO. Organization’s structure of Intel Products Vietnam Co. Business situation of Intel Products Vietnam. 5-65 ccccccrkesrkrseserree 13 ES, Titel GEVe LOB ENE GTICTIRALION oesusessssensatnesaslibdti)0ni8a56136383804066640Ág88646ã943:864g00886L 15 CHAPTER 2: THEORETICAL BASIS.
Lean Manufacturing theory.ean MarniifliCtUTiBEsux6iss46t64toiisgis0scicadbgizo0Gasseœaed 17 2:1:2:1L6an:Mnhuliehiiing tGOÏB:i:uscecoonniiocbiandbinntsddosisstlil01616S20ã3ã05554846660620336u 33. SCA DICE 0066) VN beeebedeiniddtiaYGiiLA100X0384014080Á464400ãn85615060N65036 20 2.2::NRNBGNG(016666501067853000122S80QSNG E4 6014 6611x6nsnsegetesensersesseossssrsneessasse 23 eV SH LƯỆTÌGiyt5560189ã110/056165303015i928iãi85600i8i06xg4045843ã0iW0Ă90022640GstsMsasb 24 2. standard model OVOrViCW Giá cccccda nh gn gã 0 tá gg1á1šng464406x556686ã56536ã65860k. Headcount standard: model (GOH sssessncszrscervacsuaasssaaconcecasasiseovavenesvensasvassociuastvs 26 2.
Headcount standard model with related methodology. Allowable working hours stanidar.Entipuie:aÌÌOWRTi6e:SEBHBf:¿¿;¿2issis¿xs64604 50060266 66g060001x0006100Gs4 32 CHAPTER 3: STATE OF CONTROLLING HEADCOUNT STANDARD MODEL AT SELES THE iGdiG tA UCIT. Allowable working hours standard at InteÌ. Headcount forecast for STHÍ module.
5-5-2525 S5 S55 se sesseszeerssssee 3Ó 3:4: Control the nưñìber of KHiIBNHSáciciiccgcdto Quy d tác (Q2 30x4sesssessesse 4I 3. Control MT performance to define MMR. án Se v3 se creser 43 3:6. ReAACOUNT CONWO! PROCERS MAP crs vsssssunsersiceascosacsccarersvrssaneacsacnassssarscnscoucstocadiecassgese 47 357) THe CURE SEAS At STIL INOGUI rss eonsosacsansnizeonmnecernaneveaescsseansnccaccatassavasiusssiviaaees 48 3.
The increase of idle tool time at STHI module. Apply Lean direct observation to understand clearly the current state. 52 CHAPTER 4: SOLUTION TO IMPROVE HEADCOUNT STANDARD MODEL FOR N00 90)000 2 2. Use Spaphetti điagram to find the transportation WaSf€s.
Proposed solution to address the problem. Solution for the shortage number of current Kanban. Addressing Kanban layout iSSuc. Improve the robot arm speed to pick 36 first units into motherboards.
66 4:24; Control LT) assist timesizaicsinimasannsnnii aia cena inate. Implcment a new solution for Break tỉme coverage.1mpfØVe pushinnig' Gáï1i8E1VÌUGS:sasasaonoanindiAGiidiiSiiGlagA Ga ha 0iág than ghe ãmdásacda G06 71 427 FAGAN FESOUTOES LMP OVEIAEN. Control decision-making for on hold ÏoL.9, Improve Kaizen and PM activities to increase module quality and capacity.78 4:3; Expected result after iImDTFOVGHIEHE scsaccuseiuiciicisosaoslsakssisatsissgovbsag 79 CONCEUSION ssssssisssssisasiesvansessssusexissiscanssswvtuseteveasencsibescuivasccarieasassaccabetesiseSssiaetheascitit 8 REFERENCES. sscescassossoevsnnssnsooyeansnsnncossnenseninetsice co nnvanensesnscsscnsssnnennnteansanenesiennnanacessanacsiciss 87 IẬPEE ND 6u: ciE-EBINHGIHSEOHIHHDHHRIGRRHEDWEBNRsGritbxrrmionibsesavenseenei §7 Appendix [: International Labor Organization recommended allowanees.
Rationale of the topic To survive in the fierce global marketplace, companies has struggled with reducing wastes and improving their efficiency. Effective usage of Headcounts (HC) and machines is essential in semi-conductor manufacturer like Intel for high return of investment from expensive resources in today’s competitive business environment. It is thus critical to establish optimal Headcount standard model to gain high resource utilization and output. Since VNAT started different efficiency efforts during 2019 in terms of tool and space utilization, HC and capital cost among others.
To drive this initiative, VNAT factory decided to focus on productivity project and fix operation in order to align each area against HC targets, The first component of VNAT success was management commitment to reduce Headcount. In other words, VNAT committed to lower Headcount and trusted that they would figure out how to run that way as they progressed. Therefore, a modified work- design architecture is applied to optimize the Headcount standard model. The research also discusses the shortage of traditional methods and how proper simulation can be applied to overcome these difficulty.
This topic describes the process and implementation of the HC standard model specifically to perform the relationship between operators and machines at semi-conductor manufacturer. The methodology approach developed to carry out the project was focused on the main configuration: Man-Machine Ratio (MMR) in order to capture important considerations that could impact safety, productivity and product output, This topic also reviews several of the biggest labor-saving techniques that VNAT used to run at a lower direct headcount. During six-month internship at Inte] Products Vietnam, author realized the importance and influence of Headcount standard model in conjunction with Man-Machine Ratio as well as the necessity of applying this method for each module in VNAT factory. That is the reason why author chooses this topic “Controlling Headcount standard model for STHI module at Intel Products Vietnam Co.
Objectives and goal The major goal of this topic is to analyze and control the current state of Headcount at STHI module.